Sales:
(11) 3095-4300
Indaiatuba
Phase 1
Phase 2
Phases (BTS)
MULTI MODAL INDAIATUBA

Phase 1

Implementation

A
Administration
B
VISITORS PARKING LOT
C
ENTRANCE - VEHICLES ENTRY AND EXIT
D
Cafeteria
E
Locker room
F
private parking lot
G
trucks parking lot
Check Availability

Infrastructure

    MODULES FEATURES

  • Ceiling height of 12m
  • High strength industrial floor (5 Ton/sqm)
  • Dock leveler
  • Private car spaces
  • Office mezzanine with pantry, male and female restrooms
  • Metal cover with zipped tiles (medabil)
  • Overhead lighting (natural) in the storage area dismissing the lighting of lamps during the day
  • Lanternim system of hangar air exchange, four exchanges per hour
  • Accessibility for people with special needs
  • Expected installation of private elevator per module
  • Fire fighting system triggered by sprinklers

Areas framework

Description Total Area (sqm)
Total Administrative Building 927.18
Hangar Total 29,740.45
Total Construction 30,667.63

Blueprints

Photos

Location

ROD. ENG. ERMÊNIO DE OLIVEIRA PENTEADO, 381 | JARDIM GRAMACHO | PRQ. SÃO LOURENCO | INDAIATUBA/SP

    Nearby

  • Next to the roundabout
  • Aeroporto Internacional Viracopos (12km)
  • Porto de Santos (150km)
  • São Paulo (100km)
  • Polo Shopping Indaiatuba (1km)

Sales